被室友玩屁股眼子h男男-91视-中国免费看的片-深夜毛片-91国内视频-熟女少妇一区二区三区-女人av在线-午夜视频久久-久色国产-精品人人妻人人澡人人爽牛牛-国产手机在线-av小网站-日本少妇性高潮-伊人网站在线观看-午夜视频在线观看网站-开心色99-134vcc影院免费观看-日韩一区二区不卡视频-亚洲一二三精品-91黄色入口-精品日韩中文字幕-兔费看少妇性l交大片免费-午夜啪啪小视频-中文字幕在线1-日韩在线精品强乱中文字幕-91久草视频-中国女人做爰视频-av中文版-一色道久久88加勒比一-国产精选91

How to install the copper hose of the shower?

2021-01-12 2227

Pipeline installation is also an important part of our house decoration, reasonable pipeline planning, our days can be more smooth. The use of shower copper tube is relatively extensive, and its function is also very good, but how do we install shower copper tube? Next, Xiaobian will introduce the installation skills of shower copper tube for us.

Shower copper tube

When installing sprinkler copper pipe, pipe clamps or hangers shall be set according to different pipe diameters and requirements, with accurate orientation and flat embedding. The contact between pipe clamps and copper pipes shall be tight, but the appearance of copper pipes shall not be damaged. The copper pipe support made of metal shall be selected for shower copper pipe, and the metal pad shall be added between the copper pipe and the support. The support spacing of copper pipe straight or horizontal device shall meet the requirements of Table 1 below.

The shower copper pipe should be straightened before use. The pipe should be filled with sand before straightening, and then straightened with straightener. In the process of straightening, pay attention not to use too much force, and do not make hammer marks, pits, scratches or rough marks on the surface of the pipe. The residual sand in the pipe should be cleaned in the planning of logistics work. According to the need, take appropriate amount of flux and evenly wipe it on the socket of copper pipe joint and the part where copper pipe is inserted into the joint. When the temperature reaches 650 ~ 750 ℃, the solder is fed into the welding joint. The flame can not directly heat the solder. Under the effect of capillary and wetting, the molten liquid solder can penetrate into the seam, and stop heating when all the solder melts, if heating continues. Solder will continue to penetrate in, not easy to form a full fillet. When installing copper pipe, it is necessary to prevent inverted vertical welding. If necessary, the torch flame should be aligned with the upper part of the head and heated. In order to prevent the solder from flowing down, asbestos rope can be used to wrap under the weldment to stop the flow. After welding, use wet cloth to cool and scrub the joint to stabilize the welding part and remove the slag from brazing.

衛(wèi)浴銅配件廠家

According to the planning drawings, draw the construction sketch of pipeline branch, pipe diameter, diameter change, reserved hole, valve and other accessories orientation, make the symbol in the practical device orientation, measure the practical size of copper pipe by section, and prefabricate according to this. The prefabricated copper pipes shall be transported to the position of the device according to the number and arranged in turn, and then the copper pipes shall be installed in sequence. The copper pipe installation shall be carried out in the order of main pipe first and then branch pipe. A certain distance shall be maintained between the copper pipes of the shower, and the operation space shall be reserved. When installing the copper tube in a row, the straight parts should be parallel to each other. Curve part: when the copper pipe is horizontal or straight, it shall be equidistant from the straight part; when the copper pipe is parallel up and down, the curvature radius of the elbow part shall be consistent. When laying copper pipes through expansion joints, seismic joints and settlement joints, protective measures shall be taken according to the situation

The flushing of copper pipe system shall be carried out after the pressure test of copper pipe is qualified. The water inlet and water outlet of copper pipe should be in proper position to ensure that the debris in the copper pipe system can be washed clean. The sectional area of the drainage pipe shall not be less than that of the scoured copper pipe, and the drainage pipe shall be connected to the drainage ditch. The water supply copper pipe shall be flushed with the system flow rate and the flow rate not less than 1.5m until the water color and transparency at the outlet are consistent with the visual inspection at the inlet. The water containing 20 ~ 30mg / L free chlorine per liter of water was used for disinfection. The water containing chlorine stayed in the copper tube for more than 24h, and then washed again after disinfection.

Article from: bathroom copper accessories manufacturers http://www.axm.org.cn/


Recommended news
主站蜘蛛池模板: 日韩在线 | 日韩第一页 | 麻豆国产精品 | 91在线观看| 三级在线观看 | 91在线观看18 | 日韩免费 | 亚洲三级电影 | 亚洲精品电影 | 国产精品免费看 | 波多野つ上司出差被中在线出 | 亚洲男人天堂网 | 亚洲午夜久久久久久久久久久 | 最新中文字幕 | 91视频网 | 久久一级片 | 成人黄色大片 | 国产日韩欧美 | 午夜精品久久久久久久 | 日日碰狠狠添天天爽无码 | 亚洲精品综合 | 亚洲AV无码国产精品 | 91精品国自产在线观看 | 真实乱偷全部视频 | 涩涩视频在线观看 | 妖精网站 | 国产久久精品 | 蜜桃一区二区三区 | 成人免费毛片男人用品 | 国精产品一区二区 | 光明影院手机版在线观看免费 | 日产久久视频 | 色婷婷久久 | 久久成人免费视频 | 午夜看片 | 欧美色综合 | 无码人妻精品一区二区三区不卡 | 国产成人+综合亚洲+天堂 | 日韩黄色大片 | 久久机热| 日韩中文字幕 | 亚洲精品成人无码 | 六十路息与子猛烈交尾 | 欧美自拍偷拍 | 日本欧美久久久久免费播放网 | 午夜精品久久 | 亚洲黄色片 | av午夜|